CSI Division 10 — Centralized Mail Equipment

CBU Cluster Box Unit
Installation — Turnkey.
Foundation to Postmaster.

Ironpost Works installs Florence 1570 Series cluster box units across Arizona under a single license, single contract scope — engineered concrete foundation, USPS STD-4C compliance, ADA verification, arrow lock coordination, and postmaster sign-off included. No subcontractors. No coordination gaps.

Arizona ROC #366229
Florence Authorized Installer
USPS STD-4C Compliant
ADA 28 CFR §36.304 Verified
Postmaster Sign-Off Included
What's Included

Every Phase. One Contractor. One License.

A CBU installation is not a mailbox swap. It is a permitted, engineered infrastructure project. Ironpost Works owns every phase independently — no GC coordination required.

Phase 01
Site Assessment

On-site evaluation of existing pad condition, unit count, ADA clearances, USPS access requirements, and soil conditions. Written assessment report provided.

Phase 02
Permit & Engineering

Engineered drawings, permit application, and municipal submittal. Ironpost Works carries the permit independently — no burden on the property owner or HOA board.

Phase 03
Demolition & Site Prep

Existing unit and concrete removal, debris hauling, and site preparation. Caliche soil remediation included when required by soil conditions.

Phase 04
Structural Foundation

Engineered concrete pad installation with compaction testing and anchor bolt placement per USPS specifications. New foundation or structural repair depending on existing conditions.

Phase 05
Hardware & Installation

Florence 1570 Series CBU supply and installation. Configuration selected per unit count, parcel volume, and USPS STD-4C compliance requirements for the specific site.

Phase 06
ADA Verification

Forward-reach and side-reach measurements per 28 CFR §36.304 on every installed unit. Written ADA verification included in the documentation package.

Phase 07
USPS Coordination

Postmaster meeting coordination, STD-4C compliance documentation, arrow lock procurement and installation, and delivery activation scheduling.

Phase 08
Documentation Package

Complete as-built documentation, compliance photos, postmaster sign-off letter, ADA verification report, and project records for HOA or management files.

Hardware

Florence 1570 Series — Full Configuration Range.

We specify the correct configuration for your unit count and parcel volume — not the most available model. All 1570 Series configurations are USPS-approved for centralized mail delivery.

1570-4T5
  • Tenant Doors4
  • Parcel Lockers2
  • Best ForSmall HOA clusters
1570-8
  • Tenant Doors8
  • Parcel Lockers2
  • Best ForStandard residential clusters
1570-12
  • Tenant Doors12
  • Parcel Lockers1
  • Best ForHOA replacement projects
1570-13
  • Tenant Doors13
  • Parcel Lockers1
  • Best ForOdd-count remediation
1570-16
  • Tenant Doors16
  • Parcel Lockers2
  • Best ForHigh-density clusters
1570-8T6
  • Tenant Doors8
  • Parcel Lockers4
  • Best ForHigh parcel volume properties
Who We Serve

Built for Infrastructure Decision-Makers.

HOA Communities

Aging CBU infrastructure, heaved pads, USPS delivery suspension threats, and ADA liability exposure. Ironpost Works manages the full remediation — board approval to postmaster sign-off.

Property Management

Portfolio-wide CBU assessment and replacement under a single MSA. One licensed contractor, one point of contact, one documentation standard across every property.

Multifamily Developers

New construction CBU specification, pre-construction compliance review, and CO-ready installation. No mail infrastructure delays on your certificate of occupancy timeline.

General Contractors

Ironpost Works carries the mail infrastructure permit independently. No coordination burden on your project team — hand off the scope at contract and receive a complete documentation package at completion.

Ready to Start Your CBU Project?

Submit a project intake and we'll respond with a written scope and itemized pricing within 48 hours. No commitment required.